2016 – Station rebuild announcement by FofHCS, Network Rail and northern

15th November 2016

Work on the station roof repairs were completed by 10 March 2017.

In addition to the renewal of the two roof structures over the stairways, they are also took the opportunity to carry out a number of other improvements at the station:

·         Installation of art works at various locations. 

·         Re-application of the station’s white/yellow safety lines, including “Mind the Gap” stencils.

·         Replacement of LED Lighting throughout the internal staircase areas.

·         Renewal and repair of the timber window frames.

·         Renewal of the floor covering.

·         Refurbishment of balustrade.

·         Redecoration of the internal building.